PII and Fuel Sub Infrastructure Data Rules

Current Claim Year: 2026

Last Updated: 2026-08-10

Quarterly Claims  >  Specification  >  PII and Fuel Sub Infrastructure Data Rules  >  Fuel Substitution Infrastructure Cost

PII and Fuel Sub Infrastructure Data

The reporting of Personally Identifiable Information (PII) data and Fuel Sub Infrastructure data is completed outside of Cedars at the same time as Cedars claim submissions. In aggregate, PA submissions are expected to align exactly with that year's cumulative Cedars claim data.

The submission includes:

  • Two PII data tables.
  • One Fuel Sub Infrastructure Cost table containing non-PII information.

All files are packaged together in a single .zip file for submission. The two PII tables must be provided as pipe-delimited (|) CSV files with unquoted text values. Fields must be listed in the exact order shown in the specification.

Fuel Substitution Infrastructure Cost

  Required fields

Field Name Description Data Type View rules
 ClaimID The unique and persistent record identifier and the primary key for the Claim table. Must match the corresponding ClaimID (previously CEInputID) in the Measure table. All values must start with the PA code and claim year in the format PA-YYYY. Text (up to 255 characters)
MeasureID Unique and persistent measure identifier. Text (up to 255 characters)
 SiteID The unique and persistent record identifier and the primary key for the Site table. All values must start with the PA code. Text (up to 255 characters)
 PrgID The unique and persistent program identifier. Text (up to 255 characters)
ElectricReplacedGas_Flag Is the measure replacing gas? (ex: not mini split in a garage that was not conditioned). Boolean (0 for false, 1 for true)
ExistingPanelSize Amp size of the existing panel? Text (up to 255 characters)
ExistingPanelSlots Number of circuit slots in existing panel? Text (up to 255 characters)
NewPanelSize Amp size of the new panel? Text (up to 255 characters)
NewPanelSlots Number of circuit slots in new panel? Text (up to 255 characters)
InfrastructureUpgradesRequired Is an upgrade of the panel, wiring, or outlets (or any combination of those) required for the fuel substitution measure? Text (up to 255 characters)
OtherInfrastructureUpgradesRequired Are any other infrastructure upgrades (ex: sub panel, split circuit, etc.) required for the fuel substitution measure? Text (up to 255 characters)
PanelLaborCost Labor cost of panel upgrade. Number
PanelEquipCost Equipment cost of panel upgrade. Number
WiringLaborCost Labor cost of wiring upgrade. Number
WiringEquipCost Equipment cost of wiring upgrade. Number
OutletLaborCost Labor cost of outlet upgrade. Number
OutletEquipCost Equipment cost of outlet upgrade. Number
OtherInfraLaborCost Labor cost of other infrastructure upgrades. Number
OtherInfraEquipCost Equipment costs of other infrastructure upgrades. Number
TotalInfraLaborCost The total labor cost of any and all infrastructure upgrades completed as part of the fuel substitution measure installation. Number
TotalInfraEquipCost The total equipment cost of any and all infrastructure upgrades completed as part of the fuel substitution measure installation. Number
TotalCost The total cost (labor and equipment) of any and all infrastructure upgrades completed as part of the fuel substitution measure installation. Number
OtherElectrificationMeasures Are any other electrification measures being installed at the same time as the EE fuel substitution measure (EV charging, etc.)? Text (up to 255 characters)
BldgBuiltYear Year building was built. Number (integer)
AC_Flag Does the building have AC? Boolean (0 for false, 1 for true)
ConditionedSqFt What is the square footage of the air conditioned space in the building that will be conditioned by the new fuel substitution measure? Number (integer)
InfraCustomerRequestDate If infrastructure was upgraded, when did the customer begin seeking the upgrade? Date
InfraCustomerCompleteDate If infrastructure was upgraded, when was the upgrade completed? Date
GasPipeCappingCost The cost of capping off or removing any gas pipes or flues. Number
SourceNonEEDollars The program(s) name(s) of any Federal (ex: IRA) or other state programs (ex: TECH) that provided any monetary support (ex: incentives or rebates) for the fuel substitution measure. Text (up to 255 characters)
TotalNonEEDollars The total dollar value of any Federal (ex: IRA) or other state programs (ex: TECH) that provided any monetary support (ex: incentives or rebates) for the fuel substitution measure. Number