Early Opinions

The Early Opinions page provides access to a catalog of statewide Early Opinions that provide guidance on specific technical, policy, and project-related topics. This catalog is a centralized resource for Program Administrators, implementers, and other custom project stakeholders.

Use the catalog below to find Early Opinions relevant to your custom project or topic of interest.

Download EO # EO Title EO Requestor EO Status Court CPUC Final
Decision Date
Applicable Program Primary Topic Technology / Measure EO Issue(s)
/ Question(s)
Brief Overview of
CPUC Conclusion
Date Posted Actions
49 Updated Non-DEER EUL for Pump Overhaul SCE Complete Closed 2026 Sep 3 CIAC, SEM, NMEC EUL Pumps The EO seeks approval of an updated non-DEER EUL for pump overhauls based on analysis of historical pump performance data. Based on the updated analysis and available data, the estimated pump-specific EUL values range from approximately 5.7 to 11.3 years. The available evidence supports the conclusion that the efficiency benefits associated with pump overhauls persist for at least 5 years. However, CPUC staff note that the degradation dataset remains limited. CPUC staff may reassess the EUL with an updated degradation analysis after at least six months of additional data collection. A larger dataset with longer post-overhaul degradation histories will support a more robust estimate of measure EUL in the future. 2026 Nov 16
48 Proposed Updates to CPUC Multisite Guidance Memo SCE Complete Closed 2026 Jul 9 SEM Non-Contiguous Multisite Cross-Cutting The EO proposes clarifying edits to the CPUC Multisite Guidance Memo to ensure that each site must meet M&V boundary requirements, receive site-specific SEM activities, and have an Energy Champion participate on a site-by-site basis, while allowing centralized or shared roles across sites, provided all site-level requirements are met. CPUC staff do not adopt the PA proposed redlines to the March 11, 2026 SEM Multisite Guidance Memo. The CPUC staff response clarifies interim allowances and the multisite exception request process to support consistent SEM program implementation while the SEM Real Time Multisite Study is underway. This study will assess non-contiguous multisite delivery approaches to inform future SEM guidance. Projects that do not meet these allowances may submit an exception request for case-by-case review. 2026 Nov 16